Planning Permission Granted

Planning Permission was granted on 14th November 2013 (see the plans).  We also have permission to reduce the willow and remove the conifer.

It’s scary now!  The architect is available for consultation but it’s up to me to progress things from here.  Currently I’m working through the planning conditions that are supposed to be agreed before we start.

I’m putting together a schedule of works, or more a sequence of works at the moment.  Things like remembering when we re-lay a floor downstairs to put drains in for the new bathroom we’ll build later upstairs.  It also currently includes things such as “demolish shed” followed by “don’t demolish shed yet”.

Budget is a bit frightening.   It is very difficult to cost some of the inside work, but it does lend itself to being done bit by bit when we have the money.  On the other hand that approach could ensure nothing is ever finished.

I’ll probably feel more confident when I actually start doing something.